RES’ Hydro team in Spain delivered a high-precision corrective intervention on a 40MW hydropower turbogenerator. This restored stable operation following elevated vibration levels identified during routine monitoring and confirmed through on-site measurements. The challenge In March 2025, RES was engaged to support a 40MW hydropower plant after the client suspected…