{"id":14905,"date":"2021-02-22T15:03:57","date_gmt":"2021-02-22T15:03:57","guid":{"rendered":"http:\/\/www.res-group.com\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/"},"modified":"2021-02-22T15:03:57","modified_gmt":"2021-02-22T15:03:57","slug":"res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm","status":"publish","type":"post","link":"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/","title":{"rendered":"RES appoints two leading civils contractors for the 372MW Bj\u00f6rnberget Wind Farm"},"content":{"rendered":"<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">RES has today announced the appointment of Peab and SIC as contractors for the Bj\u00f6rnberget Wind Farm in Sweden. The project is one of the largest wind farms in Europe to start construction in 2021. It is so large, RES required two contractors to deliver the balance of plant (BoP) work. Peab, a leading Nordic construction and civil engineering company, will be responsible for the foundations for 35 turbines while SIC, with decades of turbine foundations experience, will complete 25 of them. The site will have approximately 64 km of new and upgraded roads and 130 km of cabling. It\u2019s imagined at the peak of construction 200 people will be working on site.<\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">As well as managing construction, RES will also take care of the wind farm\u2019s commercial and technical management once operational.<\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">Matilda Afzelius, CEO of RES in the Nordics commented \u201cThis is an exciting point in the construction phase and we\u2019re pleased to be working with such experienced and local companies as Peab and SIC on this project. A wind farm of this size will bring prosperity to the local region, whilst helping to decarbonise Sweden\u2019s power generation\u201d.<\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\"><span style=\"color: black; background: white;\">J\u00f6rgen Eriksson,\u00a0Regional\u00a0Manager at\u00a0Peab\u00a0commented \u201dWe are very happy to partner with RES in this\u00a0large\u00a0and important\u00a0project, and contribute to society\u2019s transition into renewables\u201d.<\/span><span style=\"color: black; background: white;\">\u00a0<\/span><\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">Jens Bak Ibsen, SIC CEO said \u201cBoth RES and SIC were early movers in the wind market in the Nordics and it\u2019s great that our relationship has developed since our first construction project together back in 2005. We are looking forward to delivering the same high quality construction at Bjornberget\u201d.<\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">Bjornberget Wind Farm is jointly owned by Enlight Renewable Energy and Prime Capital\u2019s Prime Green Energy Infrastructure Fund (PGEIF). The wind farm due to go live in early 2023. It will generate 1.1TWh annually, equivalent to powering 300,000 European homes.<\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\"><span style=\"color: black; background: white;\">The wind farm will be equipped with the new Siemens Gamesa 5.X platform. There will be sixty, 6.2MW turbines and these will have the largest rotor in the onshore market, providing the lowest cost of energy.\u00a0 <\/span><\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; line-height: 150%; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\"><span style=\"font-size: 11.0pt; line-height: 150%; font-family: Calibri, sans-serif; color: black; background: white;\">\u00a0<\/span><\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">ENDS<\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<h1 style=\"margin: 12pt 0cm 3pt; font-size: 12pt; font-family: 'Trebuchet MS', sans-serif; color: #f37421;\">RES har skrivit kontrakt med tv\u00e5 entreprenadbolag f\u00f6r byggnation av den 372MW stora Vindkraftsparken Bj\u00f6rnberget<\/h1>\n<p style=\"margin: 0cm 72pt 6pt 0cm; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">RES har idag skrivit kontrakt med Peab och SIC f\u00f6r byggnation av Vindkraftsparken Bj\u00f6rnberget, bel\u00e4gen\u00a0ca\u00a020km\u00a0s\u00f6der\u00a0om\u00a0\u00c5nge\u00a0t\u00e4tort. Projektet \u00e4r en av de st\u00f6rsta vindkraftsparkerna som byggs i Europa under 2021. Projektet \u00e4r s\u00e5 omfattande, att RES anlitat tv\u00e5 entreprenadbolag f\u00f6r att leverera infrastruktur och anl\u00e4ggningsarbetet. Peab, ett av Nordens ledande f\u00f6retag inom bygg och anl\u00e4ggning, kommer att ansvara f\u00f6r 35 av de totalt 60 turbinfundamenten medan SIC, med l\u00e5ng erfarenhet inom fundamentsbyggnation, kommer att leverera resterande 25. Det totala arbetsomr\u00e5det kommer att innefatta 64 kilometer av nya eller uppgraderade v\u00e4gar och 130 kilometer kabelf\u00f6rl\u00e4ggning. Uppskattningsvis kommer ungef\u00e4r 200 personer att vara aktiva inom omr\u00e5det under byggfasen.<\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">F\u00f6rutom att hantera sj\u00e4lva byggnationen av parken kommer RES ocks\u00e5 att ansvara f\u00f6r vindkraftsparkens kommersiella och tekniska drift n\u00e4r den \u00e4r i f\u00e4rdigbyggd.<\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">Matilda Afzelius, VD f\u00f6r RES i Norden s\u00e4ger \u201cDet h\u00e4r \u00e4r en sp\u00e4nnande del av byggfasen och vi \u00e4r glada att f\u00e5 arbeta tillsammans med s\u00e5 erfarna och lokala f\u00f6retag som Peab och SIC i detta projekt. En vindkraftpark av denna storlek kommer att s\u00e5v\u00e4l skapa arbetstillf\u00e4llen i den lokala regionen, samtidigt som den hj\u00e4lper till att minska koldioxidutsl\u00e4ppen fr\u00e5n Sveriges kraftproduktion i stort.\u201d<\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\"><span style=\"color: black; background: white;\">J\u00f6rgen Eriksson,\u00a0Regionchef p\u00e5 Peab\u00a0s\u00e4ger \u201d<\/span> <span style=\"color: black; background: white;\">Vi \u00e4r mycket glada att samarbeta med RES i detta stora och viktiga projekt och att kunna bidra till samh\u00e4llets \u00f6verg\u00e5ng till f\u00f6rnybar energi\u201d.<\/span><span style=\"color: black; background: white;\">\u00a0<\/span><\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">Jens Bak Ibsen, VD f\u00f6r SIC s\u00e4ger att \u201cB\u00e5de RES och SIC har en l\u00e5ng historia tillsammans och har b\u00e5da varit tidigt involverade inom vindmarknaden i Norden. Det \u00e4r fantastiskt hur v\u00e5rt f\u00f6rh\u00e5llande har utvecklats sedan v\u00e5rt f\u00f6rsta byggprojekt tillsammans under 2005. Vi ser fram emot att leverera samma h\u00f6gkvalitativa projekt p\u00e5 Bj\u00f6rnberget.\u201d<\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">Bj\u00f6rnberget Vindkraftspark \u00e4r sam\u00e4gt av Enlight Renewable Energy och Prime Capital\u2019s Prime Green Energy Infrastructure Fund (PGEIF). Vindkraftsparken planeras att vara i drift under f\u00f6rsta halvan av 2023. Parken kommer att generera 1.1TWh per \u00e5r, motsvarar energif\u00f6rbrukningen f\u00f6r ca. 300,000 hush\u00e5ll.<\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\"><span style=\"color: black; background: white;\">Parken kommer n\u00e4r den \u00e4r f\u00e4rdigbyggd att utg\u00f6ras av 60 st 6.2MW turbiner p\u00e5 den nya Siemens Gamesa 5.X plattformen. Dessa turbiner kommer att ha marknadens nu st\u00f6rsta rotor p\u00e5 land, vilket kommer att s\u00e4kra en kostnadseffektiv energiproduktion.\u00a0 <\/span><\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; line-height: 150%; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\"><span style=\"font-size: 11.0pt; line-height: 150%; font-family: Calibri, sans-serif; color: black; background: white;\">\u00a0<\/span><\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">ENDS<\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<h1 style=\"margin: 12pt 0cm 3pt; font-size: 12pt; font-family: 'Trebuchet MS', sans-serif; color: #f37421;\">RES beauftragt zwei f\u00fchrende Bauunternehmen mit dem Bau des 372-MW-Windparks Bj\u00f6rnberget<\/h1>\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; line-height: 132%; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif; color: #6a737b;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; line-height: 132%; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif; color: #6a737b;\">RES hat heute die Vergabe der Bauauftr\u00e4ge f\u00fcr den Windpark Bj\u00f6rnberget in Schweden an Peab und SIC bekannt gegeben. Bei dem Projekt handelt es sich um einen der gr\u00f6\u00dften Windparks in Europa, dessen Bau im Jahr 2021 beginnen soll. Er ist so gro\u00df, dass RES zwei Auftragnehmer ben\u00f6tigt, um die Arbeiten f\u00fcr die Realisierung des Windparks umzusetzen. Peab, ein f\u00fchrendes skandinavisches Hoch- und Tiefbauunternehmen, wird f\u00fcr die Fundamente von 35 Turbinen verantwortlich sein, w\u00e4hrend SIC, das \u00fcber jahrzehntelange Erfahrung mit Turbinenfundamenten verf\u00fcgt, 25 dieser Fundamente fertigstellen wird. Auf dem Gel\u00e4nde werden etwa 64 km neue und ausgebaute Stra\u00dfen und 130 km Verkabelung verlegt. Man geht davon aus, dass in der Hochphase der Bauarbeiten 200 Personen auf der Baustelle t\u00e4tig sein werden.<\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; line-height: 132%; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif; color: #6a737b;\">Neben dem Baumanagement wird RES auch die kommerzielle und technische Betriebsf\u00fchrung des Windparks \u00fcbernehmen, sobald dieser in Betrieb ist.<\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; line-height: 132%; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif; color: #6a737b;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; line-height: 132%; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif; color: #6a737b;\">Dazu Matilda Afzelius, CEO von RES in Skandinavien: &#8220;Dies ist ein spannender Zeitpunkt in der Bauphase und wir freuen uns, mit so erfahrenen und lokalen Unternehmen wie Peab und SIC an diesem Projekt arbeiten zu k\u00f6nnen. Ein Windpark dieser Gr\u00f6\u00dfe wird einen gro\u00dfen Beitrag zur lokalen Wertsch\u00f6pfung vor Ort leisten und gleichzeitig dazu beitragen, die Energiegewinnung in Schweden zu dekarbonisieren&#8221;.<\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; line-height: 132%; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif; color: #6a737b;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; line-height: 132%; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif; color: #6a737b;\">J\u00f6rgen Eriksson, Regional Manager bei Peab, kommentierte: &#8220;Wir freuen uns sehr, mit RES bei diesem gro\u00dfen und wichtigen Projekt zusammenzuarbeiten und unseren Beitrag zum Umstieg der Bev\u00f6lkerung auf Erneuerbare Energien zu leisten&#8221;.<\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; line-height: 132%; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif; color: #6a737b;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; line-height: 132%; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif; color: #6a737b;\">Jens Bak Ibsen, CEO von SIC, sagte: &#8220;Sowohl RES als auch SIC waren Vorreiter auf dem skandinavischen Windmarkt und es ist gro\u00dfartig, wie sich unsere Beziehung seit unserem ersten gemeinsamen Bauprojekt im Jahr 2005 entwickelt hat. Wir freuen uns darauf, bei Bjornberget die gleiche hohe bautechnische Qualit\u00e4t zu liefern&#8221;.<\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; line-height: 132%; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif; color: #6a737b;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; line-height: 132%; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif; color: #6a737b;\">Der Windpark Bjornberget befindet sich im gemeinsamen Besitz von Enlight Renewable Energy und dem Prime Green Energy Infrastructure Fund (PGEIF) von Prime Capital. Der Windpark soll Anfang 2023 in Betrieb genommen werden. Er wird j\u00e4hrlich 1,1TWh erzeugen, was der Stromversorgung von 300.000 europ\u00e4ischen Privathaushalten entspricht.<\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; line-height: 132%; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif; color: #6a737b;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; line-height: 132%; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif; color: #6a737b;\">Der Windpark wird mit der neuen Siemens Gamesa 5.X Plattform ausgestattet. Der Windpark wird sechzig 6,2-MW-Turbinen umfassen, die den gr\u00f6\u00dften Rotor auf dem Onshore-Markt besitzen und damit die niedrigsten Energiekosten bieten.<\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; line-height: 132%; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif; color: #6a737b;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; line-height: 132%; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif; color: #6a737b;\">ENDE<\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\"><span style=\"color: #f37421;\">Notes to editors:<\/span><\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<ol>\n<li style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\"><span style=\"font-size: 10.0pt; font-family: 'Trebuchet MS', sans-serif; color: black; background: white;\">RES is the world\u2019s largest independent renewable energy company active in onshore and offshore wind, solar, energy storage and transmission and distribution. At the forefront of the industry for nearly 40 years, RES has delivered more than 19GW of renewable energy projects across the globe and supports an operational asset portfolio exceeding 7GW worldwide for a large client base.\u00a0 Understanding the unique needs of corporate clients, RES has secured over 1.5GW of power purchase agreements (PPAs) enabling access to energy at the lowest cost. RES employs more than 3,000 people and is active in 10 countries.\u00a0<\/span><span style=\"font-size: 10.0pt; font-family: 'Trebuchet MS', sans-serif; color: black; background: white;\">\u00a0<\/span><span style=\"font-size: 10.0pt; font-family: 'Trebuchet MS', sans-serif;\">For more information, visit <\/span><span style=\"font-size: 10.0pt; font-family: 'Trebuchet MS', sans-serif;\"><a href=\"http:\/\/www.res-group.com\">http:\/\/www.res-group.com<\/a><\/span><\/li>\n<\/ol>\n<ol style=\"margin-top: 0cm; margin-bottom: 0cm;\" start=\"2\" type=\"1\">\n<li style=\"margin-top: 0cm; margin-right: 0cm; margin-bottom: 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\"><span style=\"color: black; background: white;\">Peab\u00a0<\/span><span style=\"color: black; background: white;\">is the Nordic Community Builder with 15,000 employees and net sales of SEK 57 billion. With a local presence and focus on our own resources we develop, do the groundwork and build everyday life where it\u2019s lived. Company headquarters are in\u00a0F\u00f6rsl\u00f6v\u00a0on Bj\u00e4re Peninsula in southern Sweden. The\u00a0Peab\u00a0share is listed on Nasdaq Stockholm.<\/span><span style=\"color: black; background: white;\">\u00a0<\/span><a style=\"color: blue; text-decoration: underline;\" href=\"http:\/\/www.peab.com\"><span style=\"background: white;\">www.peab.com<\/span><\/a><\/li>\n<\/ol>\n<p style=\"margin: 0cm 0cm 0.0001pt 36pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<ol style=\"margin-top: 0cm; margin-bottom: 0cm;\" start=\"3\" type=\"1\">\n<li style=\"margin-top: 0cm; margin-right: 0cm; margin-bottom: 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\"><span style=\"font-size: 11.0pt; font-family: Calibri, sans-serif; color: black; background: white;\">SIC is specialised in delivering turnkey solutions in construction work for the onshore wind turbine industry.\u00a0With over 1,000 foundations and a combined 30 years of experience, SIC has developed unique specialist knowledge and competence in services and construction for the wind turbine industry. SIC offers solid, sustainable turnkey solutions within the establishment of wind turbine foundations and related civil works for all sizes of wind turbine projects. For more information, visit: <\/span><\/li>\n<\/ol>\n<p style=\"margin: 0cm 0cm 0.0001pt 36pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\"><span style=\"font-size: 11.0pt; font-family: Calibri, sans-serif; color: #333333; background: white;\">\u00a0<\/span><\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt 36pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\"><span style=\"font-size: 11.0pt; font-family: Calibri, sans-serif; color: #333333; background: white;\">Web: <\/span><a style=\"color: blue; text-decoration: underline;\" href=\"https:\/\/si-construction.com\/\"><span style=\"font-size: 11.0pt; font-family: Calibri, sans-serif; background: white;\">https:\/\/si-construction.com\/<\/span><\/a><span style=\"font-size: 11.0pt; font-family: Calibri, sans-serif; color: #333333; background: white;\"><br \/>\nFacebook: <\/span><a style=\"color: blue; text-decoration: underline;\" href=\"https:\/\/www.facebook.com\/stengeribsen\"><span style=\"font-size: 11.0pt; font-family: Calibri, sans-serif; background: white;\">https:\/\/www.facebook.com\/stengeribsen<\/span><\/a><\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt 36pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\"><span style=\"font-size: 11.0pt; font-family: Calibri, sans-serif; color: #333333; background: white;\">LinkedIn: <\/span><a style=\"color: blue; text-decoration: underline;\" href=\"https:\/\/www.linkedin.com\/company\/stenger-ibsen-construction\"><span style=\"font-size: 11.0pt; font-family: Calibri, sans-serif; background: white;\">https:\/\/www.linkedin.com\/company\/stenger-ibsen-construction<\/span><\/a><\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt 36pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<ol>\n<li style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\"><span style=\"font-family: 'trebuchet ms', geneva, sans-serif;\"><span style=\"background: white;\">R<\/span><span style=\"color: windowtext;\">ES \u00e4r v\u00e4rlden st\u00f6rsta oberoende akt\u00f6r inom f\u00f6rnybar energi \u2013 en global ledare p\u00e5 den snabbast v\u00e4xande energimarknaden. Under snart 40 \u00e5r har RES g\u00e5tt i spetsen\u00a0f\u00f6r att skapa en framtid d\u00e4r alla har tillg\u00e5ng till prisv\u00e4rd koldioxidfri energi och utvecklat och\/eller byggt \u00f6ver 19GW gr\u00f6n energi runt om i v\u00e4rlden. F\u00f6retaget driftar en portf\u00f6lj p\u00e5 \u00f6ver 7GW gr\u00f6n energi runt om i v\u00e4rlden \u00e5t en m\u00e4ngd olika akt\u00f6rer. Med f\u00f6rst\u00e5else f\u00f6r v\u00e5ra kunders unika behov har RES s\u00e4kerst\u00e4llt energik\u00f6psavtal (PPA) p\u00e5 \u00f6ver 1,5 GW globalt, vilket m\u00f6jligg\u00f6r tillg\u00e5ng till energi till l\u00e5g kostnad. <\/span><\/span><span style=\"font-family: 'trebuchet ms', geneva, sans-serif;\">RES syssels\u00e4tter mer \u00e4n 3000 anst\u00e4llda och \u00e4r verksamt i tio l\u00e4nder. <\/span><span style=\"font-family: 'trebuchet ms', geneva, sans-serif;\">Mer information finns p\u00e5 <a style=\"color: blue; text-decoration: underline;\" href=\"http:\/\/www.res-group.com\"><span style=\"background: white;\">www.res-group.com<\/span><\/a><span style=\"color: black; background: white;\">.<\/span><\/span><\/li>\n<\/ol>\n<p style=\"margin: 9.6pt 0cm 0.0001pt; text-align: justify; text-indent: 0cm; line-height: 115%; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<ol style=\"margin-top: 0cm; margin-bottom: 0cm;\" start=\"2\" type=\"1\">\n<li style=\"margin-top: 0cm; margin-right: 0cm; margin-bottom: 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\"><span style=\"font-family: 'trebuchet ms', geneva, sans-serif;\"><span style=\"color: black; background: white;\">Peab \u00e4r Nordens samh\u00e4llsbyggare med 15 000 medarbetare och en oms\u00e4ttning p\u00e5 57 miljarder kronor. Med lokal n\u00e4rvaro och fokus p\u00e5 egna resurser utvecklar, anl\u00e4gger och bygger vi vardagen d\u00e4r livet levs. Huvudkontoret ligger i<\/span>\u00a0F\u00f6rsl\u00f6v\u00a0p\u00e5 Bj\u00e4rehalv\u00f6n i s\u00f6dra Sverige.\u00a0Peab\u00a0\u00e4r listade p\u00e5 Nasdaq Stockholm.<span style=\"color: black; background: white;\">\u00a0<\/span><a style=\"color: blue; text-decoration: underline;\" href=\"http:\/\/www.peab.se\"><span style=\"background: white;\">www.peab.se<\/span><\/a><\/span><\/li>\n<\/ol>\n<p style=\"margin: 0cm 0cm 0.0001pt 36pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<ol style=\"margin-top: 0cm; margin-bottom: 0cm;\" start=\"3\" type=\"1\">\n<li style=\"margin-top: 0cm; margin-right: 0cm; margin-bottom: 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\"><span style=\"font-family: 'trebuchet ms', geneva, sans-serif;\"><span style=\"color: black; background: white;\">SIC (Stenger &amp; Ibsen Construction) \u00e4r specialiserade p\u00e5 att leverera nyckelf\u00e4rdiga l\u00f6sningar inom byggnadsarbeten f\u00f6r vindkraftindustrin p\u00e5 land. Med \u00f6ver 1000 fundament och sammanlagt 30 \u00e5rs erfarenhet har SIC utvecklat unik specialistkunskap och kompetens inom service och konstruktion f\u00f6r vindkraftsindustrin. SIC erbjuder solida, h\u00e5llbara nyckelf\u00e4rdiga l\u00f6sningar inom etablering av vindkraftsfundament och relaterade civila arbeten f\u00f6r alla storlekar av vindkraftprojekt. <\/span><span style=\"color: black; background: white;\">F\u00f6r mer information bes\u00f6k:<\/span><\/span><\/li>\n<\/ol>\n<p style=\"margin: 0cm 0cm 0.0001pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\"><span style=\"font-family: 'trebuchet ms', geneva, sans-serif; color: #333333; background: white;\">\u00a0<\/span><\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt 36pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\"><span style=\"font-family: 'trebuchet ms', geneva, sans-serif;\"><span style=\"color: #333333; background: white;\">Web: <\/span><a style=\"color: blue; text-decoration: underline;\" href=\"https:\/\/si-construction.com\/\"><span style=\"background: white;\">https:\/\/si-construction.com\/<\/span><\/a><span style=\"color: #333333; background: white;\"><br \/>\nFacebook: <\/span><span style=\"color: blue; text-decoration: underline; background: white;\"><a href=\"https:\/\/www.facebook.com\/stengeribsen\">https:\/\/www.facebook.com\/stengeribsen<\/a><\/span><\/span><\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt 36pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n<p><span style=\"font-family: 'trebuchet ms', geneva, sans-serif; font-size: 10pt;\">Zus\u00e4tzliche Informationen<\/span><\/p>\n<ol>\n<li><span style=\"font-family: 'trebuchet ms', geneva, sans-serif; font-size: 10pt;\">RES ist das weltweit gr\u00f6\u00dfte unabh\u00e4ngige Unternehmen f\u00fcr erneuerbare Energien, das in den Bereichen Onshore- und Offshore-Windkraft, Solarenergie, Energiespeicherung sowie Energie\u00fcbertragung und -verteilung t\u00e4tig ist. Seit fast 40 Jahren an der Spitze der Branche, hat RES mehr als 19 GW an erneuerbaren Energieprojekten auf der ganzen Welt realisiert und unterst\u00fctzt ein operatives Anlagenportfolio von mehr als 7 GW weltweit f\u00fcr eine gro\u00dfe Kundenbasis.\u00a0 RES versteht die individuellen Bed\u00fcrfnisse von Unternehmenskunden und hat \u00fcber 1,5 GW an Stromabnahmevertr\u00e4gen (PPAs) abgeschlossen, die den Zugang zu Energie zu m\u00f6glichst niedrigen Kosten erm\u00f6glichen. RES besch\u00e4ftigt mehr als 3.000 Mitarbeiter und ist in 10 L\u00e4ndern aktiv.\u00a0 F\u00fcr weitere Informationen besuchen Sie <a href=\"http:\/\/www.res-group.com\">http:\/\/www.res-group.com<\/a><\/span><\/li>\n<\/ol>\n<p><span style=\"font-family: 'trebuchet ms', geneva, sans-serif; font-size: 10pt;\">2. Peab ist ein skandinavischer Kommunalentwickler mit 15.000 Mitarbeitern und einem Nettoumsatz von 57 Mrd. SEK. Mit lokaler Pr\u00e4senz und Fokus auf die eigenen Ressourcen entwickeln wir, leisten die Vorarbeit und bauen das t\u00e4gliche Leben dort, wo es gelebt wird. Die Unternehmenszentrale befindet sich in F\u00f6rsl\u00f6v auf der Halbinsel Bj\u00e4re in S\u00fcdschweden. Die Peab-Aktie ist an der Nasdaq Stockholm notiert. <a href=\"http:\/\/www.peab.com\">www.peab.com<\/a><\/span><\/p>\n<p><span style=\"font-family: 'trebuchet ms', geneva, sans-serif; font-size: 10pt;\">3. SIC ist darauf spezialisiert, schl\u00fcsselfertige L\u00f6sungen bei Bauarbeiten f\u00fcr die Onshore-Windturbinenindustrie zu realisieren. Mit mehr als 1.000 Fundamenten und insgesamt 30 Jahren Erfahrung hat SIC einzigartiges Fachwissen und Kompetenz bei Dienstleistungen und Bauarbeiten f\u00fcr die Windkraftindustrie entwickelt. SIC bietet solide, nachhaltige und schl\u00fcsselfertige L\u00f6sungen bei der Errichtung von Windturbinenfundamenten und den damit verbundenen Bauarbeiten f\u00fcr Windturbinenprojekte aller Gr\u00f6\u00dfenordnungen. F\u00fcr weitere Informationen besuchen Sie uns:<\/span><\/p>\n<p><span style=\"font-size: 10pt;\"><span style=\"font-family: 'trebuchet ms', geneva, sans-serif;\">Web: <a href=\"https:\/\/si-construction.com\/\">https:\/\/si-construction.com\/<\/a><br \/>\n<\/span><span style=\"font-family: 'trebuchet ms', geneva, sans-serif;\">Facebook: <\/span><a style=\"font-family: 'trebuchet ms', geneva, sans-serif;\" href=\"https:\/\/www.facebook.com\/stengeribsen\">https:\/\/www.facebook.com\/stengeribsen<\/a><span style=\"font-family: 'trebuchet ms', geneva, sans-serif;\"><br \/>\n<\/span><span style=\"background-image: initial; background-position: initial; background-repeat: initial; background-attachment: initial; font-family: 'trebuchet ms', geneva, sans-serif; color: #333333;\">LinkedIn: <\/span><a style=\"font-family: 'trebuchet ms', geneva, sans-serif; color: blue;\" href=\"https:\/\/www.linkedin.com\/company\/stenger-ibsen-construction\"><span style=\"background-image: initial; background-position: initial; background-repeat: initial; background-attachment: initial;\">https:\/\/www.linkedin.com\/company\/stenger-ibsen-construction<\/span><\/a><\/span><\/p>\n<p style=\"margin: 0cm 0cm 0.0001pt 36pt; font-size: 10pt; font-family: 'Trebuchet MS', sans-serif;\">\n","protected":false},"excerpt":{"rendered":"<p>RES has today announced the appointment of Peab and SIC as contractors for the Bj\u00f6rnberget Wind Farm in Sweden. The project is one of the largest wind farms in Europe to start construction in 2021. It is so large, RES required two contractors to deliver the balance of plant (BoP)&#8230;<\/p>\n","protected":false},"author":1,"featured_media":13104,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[398],"tags":[],"region":[330],"content_type":[57],"class_list":["post-14905","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-fr","region-nordics-fr","content_type-presse"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>RES appoints two leading civils contractors for the 372MW Bj\u00f6rnberget Wind Farm - RES<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"RES appoints two leading civils contractors for the 372MW Bj\u00f6rnberget Wind Farm\" \/>\n<meta property=\"og:description\" content=\"RES has today announced the appointment of Peab and SIC as contractors for the Bj\u00f6rnberget Wind Farm in Sweden. The project is one of the largest wind farms in Europe to start construction in 2021. It is so large, RES required two contractors to deliver the balance of plant (BoP)...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/\" \/>\n<meta property=\"og:site_name\" content=\"RES\" \/>\n<meta property=\"article:published_time\" content=\"2021-02-22T15:03:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.res-group.com\/wp-content\/uploads\/2021\/02\/Bjornberget-Copyright-RES-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1203\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"RES\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@RESGroup\" \/>\n<meta name=\"twitter:site\" content=\"@RESGroup\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"RES\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/\"},\"author\":{\"name\":\"RES\",\"@id\":\"https:\/\/www.res-group.com\/fr\/#\/schema\/person\/e4578b8414d75c1237c6dae6f38318a2\"},\"headline\":\"RES appoints two leading civils contractors for the 372MW Bj\u00f6rnberget Wind Farm\",\"datePublished\":\"2021-02-22T15:03:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/\"},\"wordCount\":1987,\"publisher\":{\"@id\":\"https:\/\/www.res-group.com\/fr\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.res-group.com\/wp-content\/uploads\/2021\/02\/Bjornberget-Copyright-RES-1.jpg\",\"articleSection\":[\"Construction\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/\",\"url\":\"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/\",\"name\":\"RES appoints two leading civils contractors for the 372MW Bj\u00f6rnberget Wind Farm - RES\",\"isPartOf\":{\"@id\":\"https:\/\/www.res-group.com\/fr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.res-group.com\/wp-content\/uploads\/2021\/02\/Bjornberget-Copyright-RES-1.jpg\",\"datePublished\":\"2021-02-22T15:03:57+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/#primaryimage\",\"url\":\"https:\/\/www.res-group.com\/wp-content\/uploads\/2021\/02\/Bjornberget-Copyright-RES-1.jpg\",\"contentUrl\":\"https:\/\/www.res-group.com\/wp-content\/uploads\/2021\/02\/Bjornberget-Copyright-RES-1.jpg\",\"width\":1203,\"height\":800},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/www.res-group.com\/fr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"RES appoints two leading civils contractors for the 372MW Bj\u00f6rnberget Wind Farm\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.res-group.com\/fr\/#website\",\"url\":\"https:\/\/www.res-group.com\/fr\/\",\"name\":\"res-group.com\",\"description\":\"The power behind a clean energy future\",\"publisher\":{\"@id\":\"https:\/\/www.res-group.com\/fr\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.res-group.com\/fr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.res-group.com\/fr\/#organization\",\"name\":\"RES\",\"url\":\"https:\/\/www.res-group.com\/fr\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/www.res-group.com\/fr\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.res-group.com\/wp-content\/uploads\/2023\/05\/header-logo.svg\",\"contentUrl\":\"https:\/\/www.res-group.com\/wp-content\/uploads\/2023\/05\/header-logo.svg\",\"width\":82.634,\"height\":38,\"caption\":\"RES\"},\"image\":{\"@id\":\"https:\/\/www.res-group.com\/fr\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/x.com\/RESGroup\",\"https:\/\/www.instagram.com\/res_powerforgood\",\"https:\/\/www.linkedin.com\/company\/res-group\/\",\"https:\/\/vimeo.com\/resgroup\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.res-group.com\/fr\/#\/schema\/person\/e4578b8414d75c1237c6dae6f38318a2\",\"name\":\"RES\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/053fca53b00a810e8929097a40153a54ea325f90ee6ae9b45eb23c7a467d8d65?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/053fca53b00a810e8929097a40153a54ea325f90ee6ae9b45eb23c7a467d8d65?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/053fca53b00a810e8929097a40153a54ea325f90ee6ae9b45eb23c7a467d8d65?s=96&d=mm&r=g\",\"caption\":\"RES\"},\"sameAs\":[\"http:\/\/res\"],\"url\":\"https:\/\/www.res-group.com\/fr\/author\/manageruser\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"RES appoints two leading civils contractors for the 372MW Bj\u00f6rnberget Wind Farm - RES","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/","og_locale":"fr_FR","og_type":"article","og_title":"RES appoints two leading civils contractors for the 372MW Bj\u00f6rnberget Wind Farm","og_description":"RES has today announced the appointment of Peab and SIC as contractors for the Bj\u00f6rnberget Wind Farm in Sweden. The project is one of the largest wind farms in Europe to start construction in 2021. It is so large, RES required two contractors to deliver the balance of plant (BoP)...","og_url":"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/","og_site_name":"RES","article_published_time":"2021-02-22T15:03:57+00:00","og_image":[{"width":1203,"height":800,"url":"https:\/\/www.res-group.com\/wp-content\/uploads\/2021\/02\/Bjornberget-Copyright-RES-1.jpg","type":"image\/jpeg"}],"author":"RES","twitter_card":"summary_large_image","twitter_creator":"@RESGroup","twitter_site":"@RESGroup","twitter_misc":{"\u00c9crit par":"RES","Dur\u00e9e de lecture estim\u00e9e":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/#article","isPartOf":{"@id":"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/"},"author":{"name":"RES","@id":"https:\/\/www.res-group.com\/fr\/#\/schema\/person\/e4578b8414d75c1237c6dae6f38318a2"},"headline":"RES appoints two leading civils contractors for the 372MW Bj\u00f6rnberget Wind Farm","datePublished":"2021-02-22T15:03:57+00:00","mainEntityOfPage":{"@id":"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/"},"wordCount":1987,"publisher":{"@id":"https:\/\/www.res-group.com\/fr\/#organization"},"image":{"@id":"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/#primaryimage"},"thumbnailUrl":"https:\/\/www.res-group.com\/wp-content\/uploads\/2021\/02\/Bjornberget-Copyright-RES-1.jpg","articleSection":["Construction"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/","url":"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/","name":"RES appoints two leading civils contractors for the 372MW Bj\u00f6rnberget Wind Farm - RES","isPartOf":{"@id":"https:\/\/www.res-group.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/#primaryimage"},"image":{"@id":"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/#primaryimage"},"thumbnailUrl":"https:\/\/www.res-group.com\/wp-content\/uploads\/2021\/02\/Bjornberget-Copyright-RES-1.jpg","datePublished":"2021-02-22T15:03:57+00:00","breadcrumb":{"@id":"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/#primaryimage","url":"https:\/\/www.res-group.com\/wp-content\/uploads\/2021\/02\/Bjornberget-Copyright-RES-1.jpg","contentUrl":"https:\/\/www.res-group.com\/wp-content\/uploads\/2021\/02\/Bjornberget-Copyright-RES-1.jpg","width":1203,"height":800},{"@type":"BreadcrumbList","@id":"https:\/\/www.res-group.com\/fr\/resources\/res-appoints-two-leading-civils-contractors-for-the-372mw-bjornberget-wind-farm\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/www.res-group.com\/fr\/"},{"@type":"ListItem","position":2,"name":"RES appoints two leading civils contractors for the 372MW Bj\u00f6rnberget Wind Farm"}]},{"@type":"WebSite","@id":"https:\/\/www.res-group.com\/fr\/#website","url":"https:\/\/www.res-group.com\/fr\/","name":"res-group.com","description":"The power behind a clean energy future","publisher":{"@id":"https:\/\/www.res-group.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.res-group.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.res-group.com\/fr\/#organization","name":"RES","url":"https:\/\/www.res-group.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.res-group.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/www.res-group.com\/wp-content\/uploads\/2023\/05\/header-logo.svg","contentUrl":"https:\/\/www.res-group.com\/wp-content\/uploads\/2023\/05\/header-logo.svg","width":82.634,"height":38,"caption":"RES"},"image":{"@id":"https:\/\/www.res-group.com\/fr\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/RESGroup","https:\/\/www.instagram.com\/res_powerforgood","https:\/\/www.linkedin.com\/company\/res-group\/","https:\/\/vimeo.com\/resgroup"]},{"@type":"Person","@id":"https:\/\/www.res-group.com\/fr\/#\/schema\/person\/e4578b8414d75c1237c6dae6f38318a2","name":"RES","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/053fca53b00a810e8929097a40153a54ea325f90ee6ae9b45eb23c7a467d8d65?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/053fca53b00a810e8929097a40153a54ea325f90ee6ae9b45eb23c7a467d8d65?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/053fca53b00a810e8929097a40153a54ea325f90ee6ae9b45eb23c7a467d8d65?s=96&d=mm&r=g","caption":"RES"},"sameAs":["http:\/\/res"],"url":"https:\/\/www.res-group.com\/fr\/author\/manageruser\/"}]}},"_links":{"self":[{"href":"https:\/\/www.res-group.com\/fr\/wp-json\/wp\/v2\/posts\/14905","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.res-group.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.res-group.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.res-group.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.res-group.com\/fr\/wp-json\/wp\/v2\/comments?post=14905"}],"version-history":[{"count":0,"href":"https:\/\/www.res-group.com\/fr\/wp-json\/wp\/v2\/posts\/14905\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.res-group.com\/fr\/wp-json\/wp\/v2\/media\/13104"}],"wp:attachment":[{"href":"https:\/\/www.res-group.com\/fr\/wp-json\/wp\/v2\/media?parent=14905"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.res-group.com\/fr\/wp-json\/wp\/v2\/categories?post=14905"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.res-group.com\/fr\/wp-json\/wp\/v2\/tags?post=14905"},{"taxonomy":"region","embeddable":true,"href":"https:\/\/www.res-group.com\/fr\/wp-json\/wp\/v2\/region?post=14905"},{"taxonomy":"content_type","embeddable":true,"href":"https:\/\/www.res-group.com\/fr\/wp-json\/wp\/v2\/content_type?post=14905"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}