Solutions

Our passionate and experienced people deliver successful clean energy projects globally.

Our offices

Like our business, we’re truly global – but proudly local. Find contact and location details for every RES office.

Contact us

How long does TuneUp installation take?

by Scott Sandlan | Jul 16, 2026 | Reading time: < 1 min

Step 1 (find optimum settings) can take very little time if the wind farm already has Anemo installed.

The longest task is typically Step 2 (validate performance) which usually requires a multi-month validation campaign but can be shorter through use of toggling and if high quality reference measurements (eg masts or LiDARs) are available. 

Share this article