{"id":14184,"date":"2022-06-17T08:25:00","date_gmt":"2022-06-17T07:25:00","guid":{"rendered":"http:\/\/www.res-group.com\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/"},"modified":"2022-06-17T08:25:00","modified_gmt":"2022-06-17T07:25:00","slug":"swedens-largest-battery-storage-project-to-be-built-in-landskrona","status":"publish","type":"post","link":"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/","title":{"rendered":"Sweden\u2019s largest battery storage project to be built in Landskrona"},"content":{"rendered":"<p>Landskrona, a city in the south of Sweden, is growing with more companies and new residences, which increases the need for more power in the electricity grid. A challenge that can partly be solved by a battery energy storage. The batteries can be charged when the need for electricity is lower and discharged when the demand for power increases. The Landskrona storage project is set to be connected to the grid by 2023.<\/p>\n<p>The new battery storage will have a capacity of 20 MW, which corresponds to approximately one third of Landskrona&#8217;s usage. In Sweden, there are only a few battery storage projects that are integrated on the electricity grid. Landskrona will therefore be one of the first municipalities to adopt this solution. Behind the project are SCR, RES and Landskrona Energi.<\/p>\n<p>\u2013 The storage project will create the opportunity for the expansion planned for Landskrona. In the last two years, we have seen the growing demand in this region creating some supply challenges. The battery storage provides an addition of capacity that will strengthen Landskrona&#8217;s attractiveness for new local development. This makes it possible for new industries to establish themselves in the area and strengthens our local electricity grid, says Johan Holmstedt, CEO of Landskrona Energi.<\/p>\n<p>\u2013 In order for Landskrona to continue to grow with new companies and new homes, we must secure our energy needs. The new battery storage project is an effective solution that in several ways supports and strengthens the electricity network in Landskrona. Batteries will play an important role in the green transition as a stabilizing factor when more solar and wind power is developed, says Torkild Strandberg (L), chairman of the municipal board in the city of Landskrona.<\/p>\n<p>Landskrona Energi&#8217;s role is to connect the battery storage to the electricity grid. Developers behind the battery storage are RES and Scandinavian Capacity Reserve (SCR).<\/p>\n<p>\u2013 This is an exciting project for RES and another step in fulfilling our vision of a future with zero emissions. RES has developed and designed over 440 MW in storage projects globally, and we look forward to bringing that experience to this project, which will be our first in the Nordic region, says Magnus Mattsson, Commercial Manager at RES.<\/p>\n<p>\u2013 This is a big day for SCR. The collaboration with RES and Landskrona takes our first project one step closer from vision to reality, says Fredrik Bodecker, CEO of SCR.<\/p>\n<p>\u2013 The energy situation in southern Sweden shows the need for more capacity to meet future growth. A battery of this capacity helps the grid to function better and to reduce emission from other, more fossil-intensive energy power production, says Carl Hagert, Chair of the board SCR.<\/p>\n<p>A battery storage has several functions that support various parts of the electricity grid, both locally, regionally and nationally. An increasingly important function for batteries is that they can help with frequency maintenance for the entire Swedish electricity grid in a split second. Batteries can support grid stability, importing or exporting power to help maintain the frequency and supporting the addition of more weather dependent generation.<\/p>\n<p>The battery storage project will be ready for connection to the electricity grid in 2023. It will cover an area of \u200b\u200bapproximately 4,000 square meters and will be located on Gasverksgatan in Landskrona, where Landskrona Energi has its facility.<\/p>\n<p>Initial simulations and technical investigations indicate that it will be possible to connect the large battery storage to the network and these will be further verified in the future.<\/p>\n<p>_________________________________________________________________________________________________<\/p>\n<p><span style=\"font-size: 18pt\"><strong>Sveriges st\u00f6rsta batterilager byggs i Landskrona \u2013 ger mer effekt i eln\u00e4tet<\/strong><\/span><\/p>\n<p><strong>Landskrona v\u00e4xer med fler f\u00f6retag och nya bost\u00e4der. D\u00e4rf\u00f6r beh\u00f6vs mer effekt i eln\u00e4tet. Ett nytt batterilager, som lagrar energi, kan l\u00f6sa delar av utmaningen. Batterierna kan laddas upp n\u00e4r elen inte beh\u00f6vs och laddas ur n\u00e4r behovet \u00e4r stort.&nbsp; Batterilagret ska vara redo att kopplas in p\u00e5 n\u00e4tet under 2023.<\/strong><\/p>\n<p>Det nya batterilagret kommer att ha en kapacitet p\u00e5 20 MW, vilket motsvarar cirka en tredjedel av Landskronas uttag. I Sverige finns bara ett f\u00e5tal batterilager som \u00e4r integrerade i eln\u00e4tet. Landskrona blir allts\u00e5 en av de f\u00f6rsta kommunerna som f\u00e5r denna l\u00f6sning. Bakom projektet st\u00e5r SCR, RES och Landskrona Energi.<\/p>\n<p>\u2013 Batteriet skapar effekt f\u00f6r den stora expansion som sker i Landskrona. De tv\u00e5 senaste \u00e5ren har vi f\u00e5tt flera nyetableringar med stort energibehov, och det inneb\u00e4r att vi st\u00e5r inf\u00f6r en effektutmaning. Batterilagret ger ett tillskott av kapacitet som kommer st\u00e4rka Landskronas attraktionskraft. Det g\u00f6r det m\u00f6jligt f\u00f6r nya industrier att etablera sig i omr\u00e5det och f\u00f6rst\u00e4rker v\u00e5rt lokala n\u00e4t, s\u00e4ger Johan Holmstedt, vd f\u00f6r Landskrona Energi.<\/p>\n<p>\u2013 F\u00f6r att Landskrona ska kunna forts\u00e4tta v\u00e4xa med nya f\u00f6retag och nya bost\u00e4der m\u00e5ste vi s\u00e4kra v\u00e5rt energibehov. Det nya batterilagret \u00e4r en effektiv l\u00f6sning som p\u00e5 flera s\u00e4tt st\u00f6der och st\u00e4rker eln\u00e4tet i Landskrona. Batterier kommer ha en viktig roll f\u00f6r den gr\u00f6na omst\u00e4llningen som en stabiliserande faktor n\u00e4r mer sol och vindkraft byggs ut, s\u00e4ger Torkild Strandberg (L), kommunstyrelsens ordf\u00f6rande i Landskrona stad.<\/p>\n<p>Landskrona Energis roll \u00e4r att ansluta batterilagret till eln\u00e4tet. Utvecklare bakom batterilagret \u00e4r f\u00f6retagen RES och Scandinavian Capacity Reserve (SCR).<\/p>\n<p>\u201cDetta \u00e4r ett sp\u00e4nnande steg f\u00f6r RES och ytterligare ett steg i uppfyllandet av v\u00e5r vision av en framtid med nollutsl\u00e4pp\u201d s\u00e4ger Magnus Mattsson, Commercial Manager p\u00e5 RES. RES har utvecklat och konstruerat \u00f6ver 440 MW i lagringsprojekt globalt, och vi ser fram emot att ta med den erfarenheten till det h\u00e4r projektet, som blir v\u00e5rt f\u00f6rsta i Norden\u201d.<\/p>\n<p>\u201dEn stor dag f\u00f6r SCR\u201d s\u00e4ger Fredrik Bodecker, VD p\u00e5 SCR. \u201dSamarbetet med RES och Landskrona tar v\u00e5rt f\u00f6rsta projekt ett steg n\u00e4rmare fr\u00e5n vision till realitet\u201d. Styrelseordf\u00f6rande Carl Hagert h\u00e5ller med: \u201dEnergisituationen i s\u00f6dra Sverige visar p\u00e5 behovet av mer kapacitet f\u00f6r att klara framtida behov. Ett batteri av denna dimension hj\u00e4lper n\u00e4tet att fungera b\u00e4ttre och bidrar till att minska utsl\u00e4ppen fr\u00e5n annan, mer fossilintensiv kraftproduktion\u201d.<\/p>\n<p>Ett batterilager har flera funktioner som st\u00f6der flera delar av eln\u00e4tet, b\u00e5de lokalt, regionalt och nationellt. En allt viktigare funktion f\u00f6r batterier \u00e4r att de blixtsnabbt kan hj\u00e4lpa till med frekvensh\u00e5llning f\u00f6r hela Sveriges eln\u00e4t. Batterierna bidrar p\u00e5 ett effektivt s\u00e4tt att stabilisera eln\u00e4tet n\u00e4r mer oreglerad produktion som vind och sol tillf\u00f6rs.<\/p>\n<p>Batterilagret kommer att vara klart f\u00f6r inkoppling p\u00e5 eln\u00e4tet under 2023. Det kommer att t\u00e4cka en yta p\u00e5 cirka 4 000 kvadratmeter och placeras p\u00e5 Gasverksgatan i Landskrona, d\u00e4r Landskrona Energi har sin anl\u00e4ggning.<\/p>\n<p>Initiala simuleringar och tekniska utredningar indikerar att det skall g\u00e5 att ansluta det stora batterilagret till n\u00e4tet och dessa kommer att ytterligare verifieras fram\u00f6ver.<\/p>\n<p><strong>F\u00f6r mer information \/ For more information:<\/strong><\/p>\n<p>Johan Holmstedt, vd Landskrona Energi, Johan Holmstedt, <a>johan.holmstedt@landskronaenergi.se<\/a>,<\/p>\n<p>Magnus Mattsson, Commercial Manager, Renewable Energy Systems, <a>magnus.mattsson@res-group.com<\/a>, 46 703 121 288<\/p>\n<p>Torkild Strandberg, kommunstyrelsens ordf\u00f6rande, Landskrona stad, 0418-47 31 60, <a>torkild.strandberg@landskrona.se<\/a><\/p>\n<p>Carl Hagert, Styrelseordf\u00f6rande SCR, 0735076199<\/p>\n<p><strong>About RES<\/strong><br \/>\nRES is the world\u2019s largest independent renewable energy company and is active in onshore and offshore wind, solar, energy storage, green hydrogen, transmission and distribution. As an industry innovator for over 40 years, RES has delivered more than 23GW of renewable energy projects across the globe and supports an operational asset portfolio exceeding 9GW worldwide for a large client base. Understanding the unique needs of corporate clients, RES has secured over 1.5GW of corporate power purchase agreements (PPAs) enabling access to energy at the lowest cost. RES employs over 2,500 passionate people and is active in 11 countries. Visit <a href=\"http:\/\/www.res-group.com\">www.res-group.com<\/a><\/p>\n<p><strong>Om RES<\/strong><\/p>\n<p>RES \u00e4r v\u00e4rldens st\u00f6rsta oberoende akt\u00f6r inom f\u00f6rnybar energi aktiva inom land- och havsbaserad vindkraft, solenergi, energilagring, gr\u00f6n v\u00e4tgas samt transmission och distribution. I n\u00e4stan 40 \u00e5r har RES befunnit sig i branschens framkant och levererat mer \u00e4n 23 GW f\u00f6rnybara energiprojekt globalt och st\u00f6djer en operativ tillg\u00e5ngsportf\u00f6lj p\u00e5 \u00f6ver 9 GW f\u00f6r en stor kundbas v\u00e4rlden \u00f6ver. Med f\u00f6rst\u00e5else f\u00f6r de unika behoven hos f\u00f6retagskunder har RES s\u00e4krat \u00f6ver 1,5 GW i energik\u00f6psavtal (PPA) som m\u00f6jligg\u00f6r tillg\u00e5ng till energi till l\u00e4gsta kostnad. RES syssels\u00e4tter mer \u00e4n 2 500 personer och \u00e4r verksamma i 11 l\u00e4nder. I Skandinavien har RES kontor i G\u00f6teborg, \u00d6stersund och Oslo. F\u00f6r mer information, bes\u00f6k <a href=\"http:\/\/www.res-group.com\/\">www.res-group.com<\/a>.<\/p>\n<p><strong>About SCR<\/strong><\/p>\n<p>SCR was founded in spring 2021 by Carl Hagert, Fredrik Bodecker and Thomas Wiklund with the ambition to be the Nordic Market leader in developing Large Scale Battery Systems. SCR founders have many years of experience from the European and Nordic energy and finance markets with trading, risk management and business management within the energy sector. SCR\u2019s vision is to establish more than 200 MW of battery capacity mainly in regions SE3 and SE4 within the next few years to support the transition to a fossil free future supported by battery technology. For more information, visit <a href=\"http:\/\/www.scandinaviancapacityreserve.com\">www.scandinaviancapacityreserve.com<\/a><\/p>\n<p><strong>Om SCR<\/strong><\/p>\n<p>SCR grundades v\u00e5ren 2021 av Carl Hagert, Fredrik Bodecker och Thomas Wiklund med m\u00e5ls\u00e4ttningen att bli Nordens ledande akt\u00f6r inom utveckling av storskaliga batteril\u00f6sningar. Grundarna har en l\u00e5ng erfarenhet fr\u00e5n energi och finansmarknaderna i Europa och Norden med handel, riskhantering och strukturerade aff\u00e4rer inom energi. SCRs vision \u00e4r att etablera mer \u00e4n 200 MW av batterikapacitet i fr\u00e4mst SE3 och SE4 under n\u00e4rmaste \u00e5ren f\u00f6r att d\u00e4rmed st\u00f6dja en omst\u00e4llning till en fossilfri framtid som st\u00f6djs av batteriteknologi. F\u00f6r mer information, bes\u00f6k <u>www.scandinaviancapacityreserve.com<\/u><\/p>\n<p><strong>About Landskrona Energi<\/strong><\/p>\n<p>Landskrona Energi is 100% owned by the City of Landskrona via the group company Landskrona City Hall. Our operations are district heating, city networks, electricity networks and electricity trading.<\/p>\n<p>We are located in and operate for Landskrona and are part of the development of the city for new establishments. We expand where the city grows! At the same time, we maintain, upgrade and reinvest in our networks to guarantee a safe and uninterrupted everyday life for our customers. Collaborations with various parties where we ensure a sustainable infrastructure for the future and give back to the city are important to us.<\/p>\n<p><strong>Om Landskrona Energi<\/strong><\/p>\n<p>Landskrona Energi \u00e4gs till 100% av Landskrona stad via koncernbolaget Landskrona Stadshus. V\u00e5ra verksamheter \u00e4r fj\u00e4rrv\u00e4rme, stadsn\u00e4t, eln\u00e4t och elhandel. Vi g\u00f6r s\u00e5 att v\u00e5ra kunder kan duscha varmt, f\u00e5 ljus i lampan och surfa snabbt med trygg och s\u00e4ker fj\u00e4rrv\u00e4rme, el och fiber. Vi \u00e4r i ledningen f\u00f6r dig!<\/p>\n<p>Vi finns i och \u00e4r verksamma f\u00f6r Landskrona och \u00e4r en del i utvecklingen av staden f\u00f6r nya etableringar. Och d\u00e4r staden v\u00e4xer, d\u00e4r bygger vi ut. Samtidigt underh\u00e5ller, uppgraderar och reinvesterar vi v\u00e5ra n\u00e4t f\u00f6r att garantera en trygg och avbrottsfri vardag f\u00f6r v\u00e5ra kunder.<\/p>\n<p>Samarbeten med olika akt\u00f6rer \u00e4r viktigt f\u00f6r oss, d\u00e4r vi s\u00e4krar en h\u00e5llbar infrastruktur f\u00f6r framtiden och ger tillbaka till staden.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Landskrona, a city in the south of Sweden, is growing with more companies and new residences, which increases the need for more power in the electricity grid. A challenge that can partly be solved by a battery energy storage. The batteries can be charged when the need for electricity is&#8230;<\/p>\n","protected":false},"author":1,"featured_media":13751,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[334],"tags":[],"region":[328],"content_type":[211],"class_list":["post-14184","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energystorage-au","region-nordics-au","content_type-news-au"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Sweden\u2019s largest battery storage project to be built in Landskrona - RES<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sweden\u2019s largest battery storage project to be built in Landskrona\" \/>\n<meta property=\"og:description\" content=\"Landskrona, a city in the south of Sweden, is growing with more companies and new residences, which increases the need for more power in the electricity grid. A challenge that can partly be solved by a battery energy storage. The batteries can be charged when the need for electricity is...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/\" \/>\n<meta property=\"og:site_name\" content=\"RES\" \/>\n<meta property=\"article:published_time\" content=\"2022-06-17T07:25:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.res-group.com\/wp-content\/uploads\/2023\/08\/cdc929dc-24c3-416f-9bd5-5fca0428c742.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"400\" \/>\n\t<meta property=\"og:image:height\" content=\"300\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"RES\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@RESGroup\" \/>\n<meta name=\"twitter:site\" content=\"@RESGroup\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"RES\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/\"},\"author\":{\"name\":\"RES\",\"@id\":\"https:\/\/www.res-group.com\/au\/#\/schema\/person\/e4578b8414d75c1237c6dae6f38318a2\"},\"headline\":\"Sweden\u2019s largest battery storage project to be built in Landskrona\",\"datePublished\":\"2022-06-17T07:25:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/\"},\"wordCount\":1919,\"publisher\":{\"@id\":\"https:\/\/www.res-group.com\/au\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.res-group.com\/wp-content\/uploads\/2023\/08\/cdc929dc-24c3-416f-9bd5-5fca0428c742.jpeg\",\"articleSection\":[\"Energy Storage\"],\"inLanguage\":\"en-AU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/\",\"url\":\"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/\",\"name\":\"Sweden\u2019s largest battery storage project to be built in Landskrona - RES\",\"isPartOf\":{\"@id\":\"https:\/\/www.res-group.com\/au\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.res-group.com\/wp-content\/uploads\/2023\/08\/cdc929dc-24c3-416f-9bd5-5fca0428c742.jpeg\",\"datePublished\":\"2022-06-17T07:25:00+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/#primaryimage\",\"url\":\"https:\/\/www.res-group.com\/wp-content\/uploads\/2023\/08\/cdc929dc-24c3-416f-9bd5-5fca0428c742.jpeg\",\"contentUrl\":\"https:\/\/www.res-group.com\/wp-content\/uploads\/2023\/08\/cdc929dc-24c3-416f-9bd5-5fca0428c742.jpeg\",\"width\":400,\"height\":300},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/www.res-group.com\/au\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Sweden\u2019s largest battery storage project to be built in Landskrona\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.res-group.com\/au\/#website\",\"url\":\"https:\/\/www.res-group.com\/au\/\",\"name\":\"res-group.com\",\"description\":\"The power behind a clean energy future\",\"publisher\":{\"@id\":\"https:\/\/www.res-group.com\/au\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.res-group.com\/au\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.res-group.com\/au\/#organization\",\"name\":\"RES\",\"url\":\"https:\/\/www.res-group.com\/au\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/www.res-group.com\/au\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.res-group.com\/wp-content\/uploads\/2023\/05\/header-logo.svg\",\"contentUrl\":\"https:\/\/www.res-group.com\/wp-content\/uploads\/2023\/05\/header-logo.svg\",\"width\":82.634,\"height\":38,\"caption\":\"RES\"},\"image\":{\"@id\":\"https:\/\/www.res-group.com\/au\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/x.com\/RESGroup\",\"https:\/\/www.instagram.com\/res_powerforgood\",\"https:\/\/www.linkedin.com\/company\/res-group\/\",\"https:\/\/vimeo.com\/resgroup\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.res-group.com\/au\/#\/schema\/person\/e4578b8414d75c1237c6dae6f38318a2\",\"name\":\"RES\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/053fca53b00a810e8929097a40153a54ea325f90ee6ae9b45eb23c7a467d8d65?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/053fca53b00a810e8929097a40153a54ea325f90ee6ae9b45eb23c7a467d8d65?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/053fca53b00a810e8929097a40153a54ea325f90ee6ae9b45eb23c7a467d8d65?s=96&d=mm&r=g\",\"caption\":\"RES\"},\"sameAs\":[\"http:\/\/res\"],\"url\":\"https:\/\/www.res-group.com\/au\/author\/manageruser\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Sweden\u2019s largest battery storage project to be built in Landskrona - RES","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/","og_locale":"en_US","og_type":"article","og_title":"Sweden\u2019s largest battery storage project to be built in Landskrona","og_description":"Landskrona, a city in the south of Sweden, is growing with more companies and new residences, which increases the need for more power in the electricity grid. A challenge that can partly be solved by a battery energy storage. The batteries can be charged when the need for electricity is...","og_url":"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/","og_site_name":"RES","article_published_time":"2022-06-17T07:25:00+00:00","og_image":[{"width":400,"height":300,"url":"https:\/\/www.res-group.com\/wp-content\/uploads\/2023\/08\/cdc929dc-24c3-416f-9bd5-5fca0428c742.jpeg","type":"image\/jpeg"}],"author":"RES","twitter_card":"summary_large_image","twitter_creator":"@RESGroup","twitter_site":"@RESGroup","twitter_misc":{"Written by":"RES","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/#article","isPartOf":{"@id":"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/"},"author":{"name":"RES","@id":"https:\/\/www.res-group.com\/au\/#\/schema\/person\/e4578b8414d75c1237c6dae6f38318a2"},"headline":"Sweden\u2019s largest battery storage project to be built in Landskrona","datePublished":"2022-06-17T07:25:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/"},"wordCount":1919,"publisher":{"@id":"https:\/\/www.res-group.com\/au\/#organization"},"image":{"@id":"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/#primaryimage"},"thumbnailUrl":"https:\/\/www.res-group.com\/wp-content\/uploads\/2023\/08\/cdc929dc-24c3-416f-9bd5-5fca0428c742.jpeg","articleSection":["Energy Storage"],"inLanguage":"en-AU"},{"@type":"WebPage","@id":"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/","url":"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/","name":"Sweden\u2019s largest battery storage project to be built in Landskrona - RES","isPartOf":{"@id":"https:\/\/www.res-group.com\/au\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/#primaryimage"},"image":{"@id":"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/#primaryimage"},"thumbnailUrl":"https:\/\/www.res-group.com\/wp-content\/uploads\/2023\/08\/cdc929dc-24c3-416f-9bd5-5fca0428c742.jpeg","datePublished":"2022-06-17T07:25:00+00:00","breadcrumb":{"@id":"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/#primaryimage","url":"https:\/\/www.res-group.com\/wp-content\/uploads\/2023\/08\/cdc929dc-24c3-416f-9bd5-5fca0428c742.jpeg","contentUrl":"https:\/\/www.res-group.com\/wp-content\/uploads\/2023\/08\/cdc929dc-24c3-416f-9bd5-5fca0428c742.jpeg","width":400,"height":300},{"@type":"BreadcrumbList","@id":"https:\/\/www.res-group.com\/au\/resources\/swedens-largest-battery-storage-project-to-be-built-in-landskrona\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/www.res-group.com\/au\/"},{"@type":"ListItem","position":2,"name":"Sweden\u2019s largest battery storage project to be built in Landskrona"}]},{"@type":"WebSite","@id":"https:\/\/www.res-group.com\/au\/#website","url":"https:\/\/www.res-group.com\/au\/","name":"res-group.com","description":"The power behind a clean energy future","publisher":{"@id":"https:\/\/www.res-group.com\/au\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.res-group.com\/au\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Organization","@id":"https:\/\/www.res-group.com\/au\/#organization","name":"RES","url":"https:\/\/www.res-group.com\/au\/","logo":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/www.res-group.com\/au\/#\/schema\/logo\/image\/","url":"https:\/\/www.res-group.com\/wp-content\/uploads\/2023\/05\/header-logo.svg","contentUrl":"https:\/\/www.res-group.com\/wp-content\/uploads\/2023\/05\/header-logo.svg","width":82.634,"height":38,"caption":"RES"},"image":{"@id":"https:\/\/www.res-group.com\/au\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/RESGroup","https:\/\/www.instagram.com\/res_powerforgood","https:\/\/www.linkedin.com\/company\/res-group\/","https:\/\/vimeo.com\/resgroup"]},{"@type":"Person","@id":"https:\/\/www.res-group.com\/au\/#\/schema\/person\/e4578b8414d75c1237c6dae6f38318a2","name":"RES","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/secure.gravatar.com\/avatar\/053fca53b00a810e8929097a40153a54ea325f90ee6ae9b45eb23c7a467d8d65?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/053fca53b00a810e8929097a40153a54ea325f90ee6ae9b45eb23c7a467d8d65?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/053fca53b00a810e8929097a40153a54ea325f90ee6ae9b45eb23c7a467d8d65?s=96&d=mm&r=g","caption":"RES"},"sameAs":["http:\/\/res"],"url":"https:\/\/www.res-group.com\/au\/author\/manageruser\/"}]}},"_links":{"self":[{"href":"https:\/\/www.res-group.com\/au\/wp-json\/wp\/v2\/posts\/14184","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.res-group.com\/au\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.res-group.com\/au\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.res-group.com\/au\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.res-group.com\/au\/wp-json\/wp\/v2\/comments?post=14184"}],"version-history":[{"count":0,"href":"https:\/\/www.res-group.com\/au\/wp-json\/wp\/v2\/posts\/14184\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.res-group.com\/au\/wp-json\/wp\/v2\/media\/13751"}],"wp:attachment":[{"href":"https:\/\/www.res-group.com\/au\/wp-json\/wp\/v2\/media?parent=14184"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.res-group.com\/au\/wp-json\/wp\/v2\/categories?post=14184"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.res-group.com\/au\/wp-json\/wp\/v2\/tags?post=14184"},{"taxonomy":"region","embeddable":true,"href":"https:\/\/www.res-group.com\/au\/wp-json\/wp\/v2\/region?post=14184"},{"taxonomy":"content_type","embeddable":true,"href":"https:\/\/www.res-group.com\/au\/wp-json\/wp\/v2\/content_type?post=14184"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}