The Cameron Ridge Wind Project, Tehachapi, California Renewable Energy Systems (USA) Inc developed this repowering project with M&N Wind Power and then sold it on to Florida Power & Light. RES (USA) Inc was the main contractor during construction which also included demolition of 354 existing Flowind wind turbines, and substantial restoration and re-vegetation works. Substantial completion on schedule was achieved in January 1999. Information about the Project
|