Callagheen Wind Farm
Callagheen Photograph Copywrite Esler Crawford 2006.

Callagheen Wind Farm, County Fermanagh

The Callagheen wind farm is situated between Belleek and Garrison Co. Fermanagh. It received full planning permission on appeal in April 2004. The wind farm began operating in March 2006 and is contracted to supply power to Airtricity.


Information about the Project

line

Owner: ScottishPower
Developer: RES Ltd and B9 Energy Services Ltd
Turnkey Construction Contractor: Renewable Energy Systems Ltd
Operation & Maintenance Contractor: B9 Energy (O&M) Ltd
Installed Capacity: 16.9 MW
Number of Turbines: 13
Turbine Rating: 1,300 kW
Turbine Type: Siemens 1.3 MW
   