Glenchamber Wind Farm

LocationBetween New Luce, Kirkcowan and Glenluce; Dumfries and Galloway
Number of Turbines11
Tip Heightup to 126.5m
Turbine Rating2.3 MW
Total expected installed capacity25.3 MW
DeveloperRES

Google Map View of RES Wind Farm

RES has submitted a planning application for Glenchamber Wind Farm located between New Luce, Kirkcowan and Glenluce, in Dumfries and Galloway. 

The proposal is for 11 turbines, each with a maximum height of 126.5m to the tip of the blade. The planning application along with an Environmental Statement (ES) and Pre-Application Consultation (PAC) Report has been submitted to Dumfries and Galloway Council.  The wind farm has an indicative installed capacity of 25.3MW and, if approved, the wind farm is likely to generate electricity equivalent to the average demand of more than 14,000 households - or approximately 20% of the households in Dumfries and Galloway.

The planning application was submitted along with an Environment Statement and Pre-Application Consultation (PAC) Report.

Further information can be found at the Glenchamber website: www.glenchamber-windfarm.co.uk